Asenjo Energy Timeline


2007

  • Key management personnel appointed
  • Strategic review and work programme drafted

2008

  • Licence transfers completed by DGS
  • Extensive drilling programme commenced
  • Aeromag studies completed by Xcalibur

2009

  • CFO appointed
  • Marketing study completed by Wood Mackenzie
  • ERM completed High level Environmental and Social Scan for Dukwe and Mmamabula
  • SRK completed 1st CPR on all tenements

2010

  • Itasca Gas analysis Report for Mmamabula and Dukwe completed Geotechnical report for Dukwe completed
  • Received Acid Leaching Report from ERM for Dukwe tenement
  • Detailed Pre-feasibility study for Dukwe completed by Marston & Marston
  • SRK completed 2nd CPR on all tenements
  • PL222/2007 found to be unprospective and hence relinquished
  • 2 Power generation proposals (200-600 MW and 20-50 MW) submitted to the MCU

 

CONTACT US | T: +267 (0) 316 1066 (Johan Badenhorst) | E: info@asenjoenergy.com
A: Plot 117 Suite 5 Kwena House, Gaborone International Finance Park, Gaborone, Botswana
P: Postnet, PO Box AD38, ADC, Gaborone, Botswana

  © 2008 Asenjo Energy. All Rights Reserved | Disclaimer | Design by Espiál